It depends on rework more than anything
Prototype costs vary widely by category, material and number of rounds, so this guide does not quote one figure. The cost you control is rework. Every unclear instruction tends to add another round.
The F Word, a tech pack tool vendor, frames the stakes as whether a sample arrives in 10 days or 10 weeks (The F Word).